A safer and greener Southbank

During community consultations in 2023 and 2024, you told us that creating a safe park and reducing anti-social behaviour was important to you. We’re now working with an independent safety consultant to review the park and proposed changes to ensure the design follows best-practice safety standards.

In response to your feedback, the draft design aims to build neighbourhood connection through features such as:

Key design features

You can explore the proposed changes by selecting the interactive spots on the plan.

  • Over 700 square meters of additional open space.
  • 15 new trees to provide shade and create cooler environment in summer.
  • New gardens beds and low plants to support wildlife.
  • Changing the traffic flow on Miles Street from two way to one way between Dodds and Wells streets - encouraging slower speeds and safer driving.
  • Amenities and plants that are easy to maintain to promote a cleaner environment and reduce vandalism.
  • New plants to soften the look of the substation, with the opportunity to create a mural to bring colour to the area to reduce the chance of graffiti and tagging.
  • More public open space with dedicated areas for activities to encourage sport, recreation and community gatherings.
  • Additional streetlights to create a brighter environment for people travelling through the area in the evenings.
  • Landscaping improvements and short plants to ensure clear lines of sight across the park.
  • A pedestrian crossing to help people cross the road safely, reduce traffic speed and encourage active transport.
  • A small fence to separate the park from the road, creating a safer space.
  • Street furniture such as seats and picnic tables facing away from properties to ensure privacy.
  • Modern amenities such as bike hoops, rubbish bins and a drink fountain.
  • Removing four car parks and keeping 23.

View the existing and proposed expanded layout of Miles and Dodds Street Reserve.

Existing condition Proposed condition

Download the draft design plan

An accessible version of this document will be made available on request. Any enquiries, please contact City of Melbourne on 9658 9658.

Miles and Dodds Street Reserve expansion